What Happens After You Choose a Plan

Choosing a plan is the start, not the finish. Here is the typical path from a design you love to a permit-ready, buildable set.

1. Confirm the plan fits the lot

  • Compare the footprint to buildable area after setbacks.
  • Check foundation type against the flood zone and soils.

2. Adjust the design (if needed)

  • Common changes: width, garage orientation, stair location, porch depth, ceiling heights.
  • Make design changes before engineering — changes afterward cost more.

3. Engineer the structure

  • Structural engineering for wind, flood, and foundation loads.
  • Windstorm documentation for Texas coastal projects when required.
  • Sealed engineering documents, under a separate agreement, if your jurisdiction requires them.

4. Prepare for the builder and permit

  • Assemble a complete set for bidding and permit submittal.
  • Respond to plan review comments from the jurisdiction.
  • Sign the builder contract once scope and price are clear.